Facts & Figures
Here you can find key information and answers to frequently asked questions about the stadium tour.
-
Structure & Roof Construction
- Construction period: 21 months (Nov 2005 – Aug 2007)
- Concrete volume of shell: 40’000 m³
- Roof area (horizontal): 20’500 m²
- Total weight of steel structure: 3’500 t
- Number of roof trusses: 31
- Maximum truss weight: 52 t
- Maximum truss overhang: 32 m
- Underside of roof (Robinia wood): 21’000 m²
- Wood volume of underside: 508 m³
- Length of Robinia battens: 240 km
- Screws for roof grid: 320’000 pcs
- Max. load per compression support: 19’000 kN
- Max. tension per tension support: 14’000 kN
- Construction logistics: 63’000 Lastwagenfahrten (up to 337/day)
- Excavation & material movement: 350’000 m³
- Reused excavation material: 40’000 m³
- Maximum number of workers on site: 500
-
Areas & Facilities
- Stadium area: 67’000 m²
- Main field: 105 × 68 m (natural gras, heated)
- Running track: 400 m, 8 lanes (IAAF Class 1)
- Training fields:
- Infrastructur field: 106 × 68 m (artificial surface)
- Natural grass: 90 × 57 m
- Storage hall: 5’400 m², accessible for 40-ton trucks
- Single sports hall: 600 m²
- Running cellar: 140 m length, 970 m² area
- Strength & fitness room: 1
- Multipurpose rooms: 2
- Stadium management & partner offices: 11
-
Capacities
Football (Super League)
- Seats: 20’646
- Standing: 4’449
- Disabled seating: 65
- VIP-seats: 814
- Media workstations: 130
- Total: 26’104
Football (Länderspiele)
- Seats: 20’646
- Standing: 4’449
- Disabled seating: 65
- VIP-seats: 814
- Media workstations: 130
- Total: 24’061
Athletics
- Seats: 20’297
- Standing: 4’246
- Disabled seating: 65
- VIP-seats: 960
- Media workstations: 205
- Total: 25’773
Concerts
- Seats: 12’702
- Standing: 36’445
- Disabled seating: 39
- VIP-seats: 814
- Media workstations: 44
- Total: 50’044
-
Spectator Infrastructure
- Entrances: 12 (by sector)
- Turnstiles:
- Access control systems: 40
- Fixed turnstiles: 38
- Mobile turnstiles: 12
- VIP-Gates: 3
- Handheld scanners: 40
- Ticket booths: 6 (by sector)
- Restrooms: 407
- Women: 121
- Men: 124
- Urinals: 162
- Catering stations: 26
- Access system capacity: approx. 2’000 people per terminal/hour
-
VIP & Hospitality
- Lodges à 8 seats: 10
- Large lodge à 25 seats: 1
- Restaurant daily kitchen: 72 seats
- Productions- & event kitchen: 1
- Professional locker rooms – home teams (FCZ & GCZ): 2
- Professional locker room – guest team: 1
- Double locker rooms for athletics/football/concerts: 6 (12 individual rooms)
-
Technology & Security
- Lighting:
- 416 floodlights
- 6 control groups
- Vertical illuminance: 1’400 Lux
- Color rendering index > 90
- Color temperature > 5’400 K
- Sound System:
- EAW speakers in stands: 116
- Fohhn speakers outdoor areas: 10
- Community speakers in concourse areas: 240
- Total output: 220 kW
- Video Walls:
- Daktronics Outdoor Video Plus
- Active area per wall: 62,07 m²
- Pixel pitch: 13 mm
- Modules: 464
- Video Surveillance: 53 cameras
- USP-System: 1 × 1’670 kVA
- Stored energy: 16,5 MJ
- Inhouse TV: 35 flat screens
- Heating/Ventilation:
- Wood pellet boilers: 2
- Gas boiler: 1
- Hot water collectors: 90 m²
- Ventilation systems: approx. 80
- Lighting:
-
Sustainability & Turf
- Photovoltaics: 2’500 m²
- max. output: 250 kW (~80 households)
- Main Pitch Natural Grass:
- Natural Grass, 14 months old
- Area laid: 14’600 m² in 4 days
- Rolls: 510 à 1,3 t
- Grass species: Poa pratensis & Lolium perenne
- Training Pitch Natural Grass: Mix of Poa pratensis & Lolium perenne
- Infrastructure Pitch: Artificial surface
- Irrigation system: 24 sprinklers, automatic/manual
- Photovoltaics: 2’500 m²
